Home
About Us
Services
Water Resource Engineering
Highway Engineering
Urban and Regional Planning
Architectural Consultancy
Project Management Consultancy (PMC)
Structural Analysis and Design
Projects
Water Resource Engineering
Highway Engineering
Urban and Regional Planning
Project Management
Empanelment
Technological Resources
Contact Us
Water Resource Engineering
Ongoing Projects:
ERM Studies for Narayanpur Left Bank Canal as per the norms of Central Water Commission Delhi - 192 km
Completed Projects:
Modernisation of Canal Network & ERM Report
ERM Studies for Narayanpur Left Bank Canal as per the norms of Central Water Commission Delhi - 192 km
ERM Studies for Bennethora Canal Network as per the norms of Central Water Commission Delhi - 330 km
ERM Studies for Lower Mullamari Project Canal Network as per the norms of Central Water Commission Delhi - 155 km
Modernisation of Tungabhadra Left Bank Canal Network - 560 km
Planning of Canal Network for Mallabad Lift Irrigation Scheme (MLIS) - 185 Km
Lift Irrigation Schemes
Badanavalu - 10,000 Acres command area
Bannahallihundi Lift Irrigation Scheme - 7,000 Acres command area
Garbhagudi Lift Irrigation Scheme - 60 Tanks filling in Harapanahalli taluk
Rejuvenation of Tanks
Rejuvenation of 160 tanks of about 6500 acres in Kolar, Hubli, Chikmagalur and Shimoga district under JSYS Projects
Rejuvenation of tanks in Chamarajanagar district - 35 tanks
Micro Irrigation Network Planning & Design in Ajjampura for20,000 ha
Website Designed and Developed by
Global Buzz®