Ongoing Projects:

  • ERM Studies for Narayanpur Left Bank Canal as per the norms of Central Water Commission Delhi - 192 km

Completed Projects:

  • Modernisation of Canal Network & ERM Report
    • ERM Studies for Narayanpur Left Bank Canal as per the norms of Central Water Commission Delhi - 192 km
    • ERM Studies for Bennethora Canal Network as per the norms of Central Water Commission Delhi - 330 km
    • ERM Studies for Lower Mullamari Project Canal Network as per the norms of Central Water Commission Delhi - 155 km
    • Modernisation of Tungabhadra Left Bank Canal Network - 560 km
    • Planning of Canal Network for Mallabad Lift Irrigation Scheme (MLIS) - 185 Km
  • Lift Irrigation Schemes
    • Badanavalu - 10,000 Acres command area
    • Bannahallihundi Lift Irrigation Scheme - 7,000 Acres command area
    • Garbhagudi Lift Irrigation Scheme - 60 Tanks filling in Harapanahalli taluk
  • Rejuvenation of Tanks
    • Rejuvenation of 160 tanks of about 6500 acres in Kolar, Hubli, Chikmagalur and Shimoga district under JSYS Projects
    • Rejuvenation of tanks in Chamarajanagar district - 35 tanks
  • Micro Irrigation Network Planning & Design in Ajjampura for20,000 ha
  • Water Resource Engineering
  • Water Resource Engineering
Connect :     Download Brochure

3G Consultants
#40, 2nd Floor, Balaji Towers,
Adichunchanagiri Road, JTK Layout,
Kuvempunagar, Mysore - 570023

Website Designed and Developed by Global Buzz®